Technalogix Ltd
IX-1
Section IX - Operating Procedure
Assuming the previous installation instructions have been completed and cautions noted, and the
power amplifier is ready to receive a properly modulated signal, proceed with the following steps to
place the system in operation. The power amplifier has been factory aligned for channel frequency
(per system specification), signal levels and optimum performance.
IT IS
HIGHLY RECOMMENDED
THAT YOU RUN YOUR SYSTEM INTO A DUMMY LOAD
BEFORE INSTALLING TO MAKE SURE THERE ARE NO DAMAGES CAUSED IN SHIPPING AND
THE UNIT IS RUNNING PROPERLY
1. Do not apply a modulated RF drive signal to the power amplifier at this time.
2. Verify that all control and RF cables are tight and properly seated in or on the mating connector.
3. Plug the modulator or processor into AC mains (specified by the manufacturer), while still
disconnected from the power amplifier.
4. With the power amplifier loaded into the filter and the filter loaded into the antenna (or
dummy load), power up the amplifier by turning on power supply (either externally or via on
the ON/OFF switch on the back of the power amplifier depending on the system).
5. Verify that the power amplifier fans are all on. The fans are powered via DC voltage so this is an
indication that the power supply is started and running.
6. The internal soft start circuitry will turn the bias voltages off until the power supply to the
amplifier pallets is fully stable. The front display indicates when the soft start is running with
either a displayed message when an LCD option is installed or via maximum attenuation when
a touch screen option is installed. Once complete, the Forward and Reflected Power and Power
Supply readings will appear on the LCD in the filter and power amplifier enclosures.
7. Verify that a low input level warning is displayed. This ensures that the power amplifier has
placed maximum attenuation on its input and is ready to receive the RF drive signal. On
systems with the touchscreen option installed, this attenuation is displayed in the lower right
corner of the screen (39 is maximum attenuation).
8. After the soft start is complete, apply the RF drive signal (which still should be turned down)
between the modulator or processor and the power amplifier RF In (BNC female). This ensures
that the RF drive signal is applied only after the power supply is stable and the bias voltages are
applied to the amplifier.
Summary of Contents for TAUD-100
Page 1: ...TAUD 1000 BROADCAST TRANSMITTER OPERATING MANUAL ...
Page 34: ......
Page 35: ......
Page 49: ......
Page 50: ......
Page 52: ...Technalogix Ltd Adrenaline Control System VI 31 Temp sensor 1 11 component layout Top ...
Page 53: ...Technalogix Ltd Adrenaline Control System VI 32 Temp sensor 1 11 component layout bottom ...
Page 58: ......
Page 59: ......
Page 62: ......
Page 63: ......
Page 69: ...Technalogix Ltd Adrenaline Control System VI 66 SNMP Configuration ...