![Taylor PH61 Operator'S Manual Download Page 46](http://html.mh-extra.com/html/taylor/ph61/ph61_operators-manual_822773046.webp)
6-14
OPERATING PROCEDURES
PH61 Peristaltic Pump
Operating Procedures
6
7.
Fill the squeeze bottle with cleaning/sanitizing
solution. With a pail beneath the door, insert the tube
end of the squeeze bottle into the syrup port.
Squeeze the bottle firmly. This will force solution out
of the adjacent port and down around the spinner.
This procedure should be performed for at least 10
seconds per port. (See Figure 6-53.)
Figure 6-53
8.
Install the restrictor cap on the freezer door spout.
Figure 6-54
9.
Use a clean, sanitized towel to wipe down the freezer
door and area around the bottom of the freezer door.
10. Install the shake cup holder.
11. Raise a syrup valve retainer. Install the syrup valve.
Push the syrup valve retainer down to hold the valve
in place. Repeat this procedure for each syrup valve.
Figure 6-55
12. When ready to resume normal operation, press the
AUTO key. (See Figure 6-56.)
Figure 6-56
Note:
This step should be performed approximately 15
minutes prior to serving product.
23005
23019
23021
Summary of Contents for PH61
Page 8: ...1 4 TO THE INSTALLER PH61 Peristaltic Pump To the Installer 1 Notes ...
Page 14: ...3 4 SAFETY PH61 Peristaltic Pump8 Safety 3 Notes ...
Page 32: ...5 10 USER INTERFACE PH61 Peristaltic Pump User Interface 5 Notes ...
Page 56: ...6 24 OPERATING PROCEDURES PH61 Peristaltic Pump Operating Procedures 6 Notes ...
Page 64: ...9 2 PARTS REPLACEMENT SCHEDULE PH61 Peristaltic Pump Parts Replacement Schedule 9 Notes ...
Page 72: ...11 4 LIMITED WARRANTY ON PARTS PH61 Peristaltic Pump Limited Warranty on Parts 11 Notes ...