OPERATING PROCEDURES
6-7
PH61 Peristaltic Pump
Operating Procedures
6
7.
Insert the valve cap into the hole in the mix inlet
adaptor. (See Figure 6-28.)
Figure 6-28
8.
Insert the mix inlet assembly into the pump cylinder.
Figure 6-29
Note: The adaptor must be positioned into the notch
at the end of the pump cylinder.
9.
Secure the pump parts in position by sliding the
retaining pin through the cross holes at one end of
the pump cylinder. (See Figure 6-30.)
Figure 6-30
Note: The head of the retaining pin should be at the
top of the pump when installed.
10. Assemble the feed tube assembly. Slide the check
ring into the groove of the feed tube.
Figure 6-31
11. Install one red O-ring on each end of the mix feed
tube and thoroughly lubricate. (See Figure 6-32.)
Figure 6-32
12. Lay the pump assembly, pump clip, feed tube, cotter
pin, and agitator in the bottom of the mix hopper for
sanitizing. (See Figure 6-33.)
Figure 6-33
15209
15120
15121
Apply the appropriate
Taylor approved food safe lubricant.
HP
12310
Summary of Contents for PH61
Page 8: ...1 4 TO THE INSTALLER PH61 Peristaltic Pump To the Installer 1 Notes ...
Page 14: ...3 4 SAFETY PH61 Peristaltic Pump8 Safety 3 Notes ...
Page 32: ...5 10 USER INTERFACE PH61 Peristaltic Pump User Interface 5 Notes ...
Page 56: ...6 24 OPERATING PROCEDURES PH61 Peristaltic Pump Operating Procedures 6 Notes ...
Page 64: ...9 2 PARTS REPLACEMENT SCHEDULE PH61 Peristaltic Pump Parts Replacement Schedule 9 Notes ...
Page 72: ...11 4 LIMITED WARRANTY ON PARTS PH61 Peristaltic Pump Limited Warranty on Parts 11 Notes ...