![Taylor PH61 Operator'S Manual Download Page 36](http://html.mh-extra.com/html/taylor/ph61/ph61_operators-manual_822773036.webp)
6-4
OPERATING PROCEDURES
PH61 Peristaltic Pump
Operating Procedures
6
12. Lubricate the inside of the freezer door spout, top
and bottom. (See Figure 6-13.)
Figure 6-13
13. Insert the draw-valve spinner assembly from the
bottom until the slot in the draw valve, which accepts
the draw handle, comes into view. (See Figure 6-14.)
Figure 6-14
14. Install and lubricate the pivot pin O-ring.
Figure 6-15
15. With the stopping tab of the draw handle facing
down, slide the fork of the draw handle into the slot of
the draw valve. Secure the draw handle with the pivot
Figure 6-16
16. Lubricate the shaft of the spinner blade up to the
Figure 6-17
23011
Apply the appropriate
Taylor approved food safe lubricant.
HP
23014
Apply the appropriate
Taylor approved food safe lubricant.
HP
23061
Apply the appropriate
Taylor approved food safe lubricant.
HP
Summary of Contents for PH61
Page 8: ...1 4 TO THE INSTALLER PH61 Peristaltic Pump To the Installer 1 Notes ...
Page 14: ...3 4 SAFETY PH61 Peristaltic Pump8 Safety 3 Notes ...
Page 32: ...5 10 USER INTERFACE PH61 Peristaltic Pump User Interface 5 Notes ...
Page 56: ...6 24 OPERATING PROCEDURES PH61 Peristaltic Pump Operating Procedures 6 Notes ...
Page 64: ...9 2 PARTS REPLACEMENT SCHEDULE PH61 Peristaltic Pump Parts Replacement Schedule 9 Notes ...
Page 72: ...11 4 LIMITED WARRANTY ON PARTS PH61 Peristaltic Pump Limited Warranty on Parts 11 Notes ...