22
pinned, and all fasteners tight
Halyards installed
Spars and Rigging (After-stepped)
YES
NO
CORRECTED
Standing rigging adjusted
Turnbuckles pinned and taped
Roller furling systems properly assembled
Spreader angle corrected
Mast rake correct
Winches run free
Sails fit and furl freely
Sheets installed and functional
Halyards function properly
Mast boot installed (if required)
Mast lights operational
Steering Inspection
YES
NO
CORRECTED
Wheel rotates easily and uniformly, and steering cables
properly tensioned
Compass swung
No unusual pump noise. (if hydraulic)
Connections at rudder post tight
Fresh Water System
YES
NO
CORRECTED
Cold water runs freely from all faucets
Hot water runs freely from all faucets
Summary of Contents for VANCOUVER 42
Page 1: ...1 OPERATIONS AND MAINTENANCE MANUAL TAYANA VANCOUVER 42...
Page 2: ...2 Tayana V 42 Center Cockpit Sailplan...
Page 3: ...3 Tayana V 42 Aft Cockpit Interior Layout...
Page 12: ...12 Figure II 1 Fiberglass Layout Schedule...
Page 13: ...13 Figure II 2 V 42 Deck and Hull Joint...
Page 19: ......
Page 37: ...37 Figure IV 1 Fuel Supply Plumbing...
Page 38: ...38 Figure IV 2 Fluid Plumbing System...
Page 39: ...39 Figure IV 3 Center Cockpit Tankage Diagram...
Page 43: ...43 TABLE IV 1 Direct Current Energy Audit...
Page 48: ...48 Figure IV 6 Waste Water Plumbing System...
Page 51: ...51 Figure IV 8 Propane System...