![Tayana VANCOUVER 42 Operation And Maintenance Manual Download Page 30](http://html1.mh-extra.com/html/tayana/vancouver-42/vancouver-42_operation-and-maintenance-manual_3748999030.webp)
30
f. Sails. Wash and let dry thoroughly. Store in dry area.
7. Drain shower pan and clean strainer.
8. Wash exterior. Polish, wash, and lubricate metal deck hardware.
9. Clean and preserve spars. Lubricate winches and sheaves. Inspect for any damage.
10. Clean standing rigging and inspect for damage.
11. Review all optional equipment manuals. Follow any winterizing procedures given.
Generators, air-conditioning systems, and some refrigeration systems are among those systems
which require winterizing.
12. If boat is hauled, clean and inspect bottom thoroughly. Pay particular attention to signs of
structural damage to glass, rudder operation, gudgeon weldment and fasteners, electronic senders,
thru-hulls, propeller, and zincs.
NOTE:
If you are uncertain as to where to place the lifting straps, you may wish to disconnect the
prop shaft coupling prior to hauling the yacht, and follow hauling instructions in this manual.
Generally most yards are familiar with the location of the lifting straps and the keel cut out, so that
they will not try to haul on the prop shaft.
NOTE:
It is a good practice to record items that were given attention and any defects found
during decommissioning. This list will be valuable to you when recommissioning in the spring.
13. You may wish to use deck covers and/or various devices available to prevent ice formation
around a yacht stored in the water. These will provide additional protection to the yacht during the
winter months. Consult your local marina for information and sources of this equipment.
E. Recommissioning after Lay-up
Recommissioning after lay-up is somewhat less involved than the initial commissioning. The
following steps are suggested:
1. Check notes on decommissioning and make any necessary repairs
2. Check operation of all thru-hulls before launching boat.
3. Apply anti-fouling bottom paint. Add zincs, if required and check continuity.
4. Clean exterior of boat thoroughly.
5. Re-install charged batteries, checking terminals for correct polarity.
Summary of Contents for VANCOUVER 42
Page 1: ...1 OPERATIONS AND MAINTENANCE MANUAL TAYANA VANCOUVER 42...
Page 2: ...2 Tayana V 42 Center Cockpit Sailplan...
Page 3: ...3 Tayana V 42 Aft Cockpit Interior Layout...
Page 12: ...12 Figure II 1 Fiberglass Layout Schedule...
Page 13: ...13 Figure II 2 V 42 Deck and Hull Joint...
Page 19: ......
Page 37: ...37 Figure IV 1 Fuel Supply Plumbing...
Page 38: ...38 Figure IV 2 Fluid Plumbing System...
Page 39: ...39 Figure IV 3 Center Cockpit Tankage Diagram...
Page 43: ...43 TABLE IV 1 Direct Current Energy Audit...
Page 48: ...48 Figure IV 6 Waste Water Plumbing System...
Page 51: ...51 Figure IV 8 Propane System...