9. Launch and inspect all underwater fittings for leaks.
10. Fill fuel, water, and propane tanks and search for leaks. Ensure that there are no leaks in propane
tank storage compartment. Adding water to compartment and looking for leaks may be necessary.
11. Install pulpits, stanchions, lifeline lines, safety lifeline ends and gates.
12. Install standing and running rigging on mast.
13. Install antennas and other electronics on masthead. Check mast wiring and lights.
14. Step mast, set up and adjust rig, pin and tape all turnbuckles, check halyards.
15. Reeve sheets, bend on and hoist sails, furl sails.
16. Align engine to .002" max. clearance.
17. Check oil and water level in engine.
18. Complete installation of owner or dealer supplied equipment.
19. Check battery condition and recharge if necessary.
20. Check engine operation.
Note:
Carefully read your engine manual before operating your engine. Do not let the engine idle for
an extended period during break-in period.
21. Check operation of all systems and equipment.
22. Check all doors and drawers for proper movement and secure latching.
23. Water test decks, fittings, and ports and search for leaks.
24. Sea trial under power and sail.
25. Re-check for leaks in interior plumbing systems (fuel, water, and waste) and exterior hardware.
26. Clean interior and exterior of yacht thoroughly.
Summary of Contents for VANCOUVER 42
Page 1: ...1 OPERATIONS AND MAINTENANCE MANUAL TAYANA VANCOUVER 42...
Page 2: ...2 Tayana V 42 Center Cockpit Sailplan...
Page 3: ...3 Tayana V 42 Aft Cockpit Interior Layout...
Page 12: ...12 Figure II 1 Fiberglass Layout Schedule...
Page 13: ...13 Figure II 2 V 42 Deck and Hull Joint...
Page 19: ......
Page 37: ...37 Figure IV 1 Fuel Supply Plumbing...
Page 38: ...38 Figure IV 2 Fluid Plumbing System...
Page 39: ...39 Figure IV 3 Center Cockpit Tankage Diagram...
Page 43: ...43 TABLE IV 1 Direct Current Energy Audit...
Page 48: ...48 Figure IV 6 Waste Water Plumbing System...
Page 51: ...51 Figure IV 8 Propane System...