20
Delivery Inspection
YES
NO
CORRECTED
Boat properly cradled
Spars properly cradled
Free of sideswipe damage
Companionway seals unbroken
Absence of exterior hardware theft
Loose gear inventory complete
Propeller secured properly
Rudder moves freely
Prop shaft turns freely
All below waterline fastenings are tight
All plumbing thru-hulls connected and securely fastened
All thru-hull valves cycled and shut
Launching Inspection
YES
NO
CORRECTED
Boat properly slung during launch
No damage during launch
Thru-hull fittings leak-free
Rudder bearing leak-free
Shaft packing nuts adjust to 1 drop/30 seconds with engine
off but newer dripless packing do not drip.
Thru-hull valves, connecting hoses and plumbing leak-free
with valves open
Summary of Contents for VANCOUVER 42
Page 1: ...1 OPERATIONS AND MAINTENANCE MANUAL TAYANA VANCOUVER 42...
Page 2: ...2 Tayana V 42 Center Cockpit Sailplan...
Page 3: ...3 Tayana V 42 Aft Cockpit Interior Layout...
Page 12: ...12 Figure II 1 Fiberglass Layout Schedule...
Page 13: ...13 Figure II 2 V 42 Deck and Hull Joint...
Page 19: ......
Page 37: ...37 Figure IV 1 Fuel Supply Plumbing...
Page 38: ...38 Figure IV 2 Fluid Plumbing System...
Page 39: ...39 Figure IV 3 Center Cockpit Tankage Diagram...
Page 43: ...43 TABLE IV 1 Direct Current Energy Audit...
Page 48: ...48 Figure IV 6 Waste Water Plumbing System...
Page 51: ...51 Figure IV 8 Propane System...