31
6. Launch, step spar (if unstepped), connect rigging, bend on sails. Check all components prior to re-
installing them.
7. Reconnect coupling and check engine alignment.
8. If engine was drained, replace all drain plugs, tighten caps, and shut drain cocks. Fill and bleed
engine cooling system.
9. Fill fuel tank. Bleed engine fuel system per instructions in engine manual.
10. Replace hot water heater plug and reconnect water line at pump. Flush the fresh water system,
then fill the water tanks.
11. Clean and inspect engine and engine room equipment. Check oil levels throughout.
12. Clean interior thoroughly.
13. Check operation of all systems.
14. Install cushions, carpet, electronics, and other loose gear removed during winterizing.
15. Sea trial.
NOTE
: The check list provided in Section III-A will be a useful reference for the yacht's condition
after recommissioning.
Summary of Contents for VANCOUVER 42
Page 1: ...1 OPERATIONS AND MAINTENANCE MANUAL TAYANA VANCOUVER 42...
Page 2: ...2 Tayana V 42 Center Cockpit Sailplan...
Page 3: ...3 Tayana V 42 Aft Cockpit Interior Layout...
Page 12: ...12 Figure II 1 Fiberglass Layout Schedule...
Page 13: ...13 Figure II 2 V 42 Deck and Hull Joint...
Page 19: ......
Page 37: ...37 Figure IV 1 Fuel Supply Plumbing...
Page 38: ...38 Figure IV 2 Fluid Plumbing System...
Page 39: ...39 Figure IV 3 Center Cockpit Tankage Diagram...
Page 43: ...43 TABLE IV 1 Direct Current Energy Audit...
Page 48: ...48 Figure IV 6 Waste Water Plumbing System...
Page 51: ...51 Figure IV 8 Propane System...