42
Tests at end of installation shall include at least:
· Operating conditions of ISM shall comply with
requirements of the rating plate.
· Check for damage, remove dirt or contamination
· Unsupported busbar length according to page 21, 22
· Fixing points according to page 21
· Check bolts and torques to pages 20, 21, 23
· Minimum clearances due to rated insulation voltage
according to page 22
· Minimum clearances due to electromagnetic influence
according to page 23
· Protective grounding according to page 23
· Free air circulation around the ISM
Testing the rated insulation level to ANSI C37.06:
· For applications from 5 to 15 kV ISM the rated power
frequency test voltage is 36 kV
· For applications below 5 kV ISM the rated power
frequency test voltage is 19 kV
General
Commissioning, operation and maintenance is only permitted for qualified and trained personnel.
Insofar as installation, commissioning or retrofit is carried out on energized equipment, the relevant safety
regulations for local and national standards must be adhered to.
When designing and mounting a panel for the first time an acceptance of the equipment must be carried out
together with Tavrida Electric in order to ensure the installation conditions.
The ISM must always be tested and operated together with the CM. Individual testing is not possible and
may lead to the destruction of the ISM.
Caution
Danger!
Commis s ioning Secondary Part
Preparation before testing the functionality shall include at least:
· Installation of CM according to page 30.
· Availability of the CM auxiliary power supply. It is recommended to use the same auxiliary power supply
as that for protection and control devices.
· Type of voltage (AC or DC) and voltage level according to selected CM type.
· Polarity of auxiliary power supply and selection of MCB according to page 32.
· Connection between CM and ISM acccording to pages 29 - 35, 63, 64.
· Checking that all secondary connections have been fastened correctly per electrical code standards
Commis s ioning Primary Part
5
Summary of Contents for ISM Shell_2 Series
Page 2: ...2...
Page 6: ...6 1 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 7: ...7 Introduction 1...
Page 12: ...12 1 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 13: ...13 Receiving Handling and Storage 2...
Page 19: ...19 Ins tallation 3...
Page 36: ...36 3 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 37: ...37 Switching and Control Functions 4...
Page 41: ...41 Commiss ioning Maintenance 5...
Page 44: ...44 5 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 45: ...45 Signalling 6...
Page 49: ...49 Special Applications Fast Switching 6...
Page 53: ...53 Product Line 7...
Page 55: ...55 Dimens ions and Weights 8...
Page 61: ...61 8 Mating part with interlocking lever Interlockingshaftwithmountedinterlockinglever...
Page 62: ...62 Circuit Diagrams 9...
Page 63: ...63 ISM15_Shell_2 with CM_1501_01 9...
Page 64: ...64 ISM15_Shell_2 with CM_16_1 9...
Page 65: ...65 9 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 66: ...66 Technical Data 10...
Page 71: ...71 10 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 72: ...72 Regulations and Ambient Conditions 11...
Page 74: ...74 Legal Information 12...
Page 77: ...77 12 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 79: ...79 Date 12...
Page 80: ...80 Date 12...
Page 81: ...81 Date 12...