Solo Plus Instructions 1-800-782-9927 Version 12-13
Tarm Biomass · 4 Britton Lane · Lyme, NH 03768
This product is provided with a limited warranty which is described in Section 7.0 of this man-
ual. The warranty is contingent upon the successful and legal installation of the boiler At a mini-
mum:
The installation, adjustment, start-up, service, and maintenance of this product must be
performed by a licensed professional heating system installer. Where applicable, the
installation must be inspected and accepted by the legally responsible entity.
The instructions in this manual and in supporting documentation (additional instruc-
tions, diagrams, and component information provided by Tarm Biomass) must be explic-
itly followed. However, where the instructions are in conflict with local code require-
ments, the local code requirements will prevail. When in doubt, contact your local
dealer or Tarm Biomass.
The manual and supporting documentation must be retained by the owner/ system op-
erator for reference and future use.
The installer is responsible for familiarizing the owner/ system operator with all aspects
of boiler operations, safety procedures, monitoring and cleaning requirements, shut
down procedures, and annual maintenance requirements.
Conditions described in the text of the warranty for keeping it in force must be followed
by the owner/ system operator.
Introduction > Foreword Page 2