Watch out for hazardous working
conditions
PRECAUTIONS WHEN OPERATING
• Never undercut a high bank. Doing so is
dangerous as it may cause ground
collapse.
• Do not operate in places where there is a
danger of falling rocks.
• Maintain a safe distance between the
machine and the edge of the digging site.
Do not dig the ground under the front of
the machine.
• When working close to the cliffs or road
shoulders, to make it easier to escape if
there is any problem, set the crawlers at
right angles to the cliff or road shoulder and
the dozer blade to the front when carrying
out operations.
• Do not enter areas where there is soft
ground. Doing so could cause the machine
to tilt under its own weight, resulting in a
machine tipping over or sinking into the
ground.
• Do not come close to unstable grounds
(cliffs, road shoulders, deep ditches). If the
ground should collapse under the weight
or vibration of the machine, there is a
hazard that the machine may fall or tip
over.
· Remember that the soil after heavy rain
or blasting is weak.
· The ground of top of the embankment
and of the circumferences of the
excavated ditches are also weak.
Summary of Contents for TB225
Page 1: ......
Page 7: ...0 5...
Page 12: ...0 10...
Page 13: ...1 1 SAFETY...
Page 52: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 53: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 54: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 55: ...1 43 SAFETY SAFETY SIGNS DECALS...
Page 56: ...1 44...
Page 57: ...2 1 CONTROLS...
Page 69: ...2 13 MEMO...
Page 105: ...2 49 MEMO...
Page 131: ...3 1 OPERATION...
Page 161: ...4 1 TRANSPORT...
Page 165: ...4 5 TRANSPORT HOISTING THE MACHINE Two point suspension Three point suspension...
Page 167: ...5 1 MAINTENANCE...
Page 189: ...5 23 MEMO...
Page 209: ...5 43 MEMO...
Page 231: ...6 1 TROUBLESHOOTING...
Page 250: ...6 20...
Page 251: ...7 1 SPECIFICATIONS...
Page 253: ...7 3 MEMO...
Page 254: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS Cab MACHINE DIMENSIONS...
Page 256: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS Canopy...
Page 258: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 260: ...7 10 MEMO...
Page 262: ...7 12 SPECIFICATIONS Long arm Cab LIFTING CAPACITIES...
Page 263: ...7 13 SPECIFICATIONS Long arm Cab LIFTING CAPACITIES...
Page 264: ...7 14 SPECIFICATIONS Long arm Canopy LIFTING CAPACITIES...
Page 265: ...7 15 SPECIFICATIONS LIFTING CAPACITIES Long arm Canopy...
Page 266: ...7 16 SPECIFICATIONS Standard arm Cab LIFTING CAPACITIES...
Page 267: ...7 17 SPECIFICATIONS Standard arm Cab LIFTING CAPACITIES...
Page 268: ...7 18 SPECIFICATIONS Standard arm Canopy LIFTING CAPACITIES...
Page 269: ...7 19 SPECIFICATIONS LIFTING CAPACITIES Standard arm Canopy...
Page 270: ...7 20...
Page 271: ...8 1 OPTIONS...
Page 279: ...8 9 MEMO...
Page 284: ...8 14 OPTIONS CAB OPTIONS CAB OPTIONS 1 Front guard 2 Emergency hammer 3 Front light Right...
Page 295: ...8 25...
Page 296: ...8 26...