![background image](http://html2.mh-extra.com/html/takeuchi/tb225/tb225_operators-manual_3342967219.webp)
5-53
MAINTENANCE
WHEN REQUIRED
WHEN REQUIRED
REPLACING THE BUCKET TEETH AND
THE SIDE CUTTERS
Replace the bucket teeth and the side
cutters when the tooth points or the side
cutters are worn. Do not wait until the
adapter or bucket is damaged.
• Before performing maintenance or
repairs under the machine, lower all
moveable working equipment to the
ground or in the lowermost position.
• To prevent unexpected movement,
firmly secure the working equipment
when repairing or replacing the bucket
teeth or side cutter.
• When using a hammer, pins may fly out
or metal particles may be scattered.
This may lead to serious injury.
· If hard metal parts such as pins,
bucket teeth, side cutter or bearings
are hit with a hammer, wear protective
gear such as safety goggles and
gloves.
· When hitting pins or bucket teeth,
always check that there is no one in
the surrounding area.
• Do not allow unauthorized personnel in
the work area while working.
• Bucket tooth <V13SY or V17S>
Removal
1. Clean the bucket and park the machine in
a flat, safe place where the ground is hard.
2. Set the bottom surface of the bucket flat
and lower it on a block so that the locking
pin (1) can be knocked out.
3. Remove the key, then check that the
bucket is stable.
4. Place a rod against the locking pin (1) and
knock the locking pin out by hammering
against the rod.
The rod should be round and thinner than
the locking pin.
Summary of Contents for TB225
Page 1: ......
Page 7: ...0 5...
Page 12: ...0 10...
Page 13: ...1 1 SAFETY...
Page 52: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 53: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 54: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 55: ...1 43 SAFETY SAFETY SIGNS DECALS...
Page 56: ...1 44...
Page 57: ...2 1 CONTROLS...
Page 69: ...2 13 MEMO...
Page 105: ...2 49 MEMO...
Page 131: ...3 1 OPERATION...
Page 161: ...4 1 TRANSPORT...
Page 165: ...4 5 TRANSPORT HOISTING THE MACHINE Two point suspension Three point suspension...
Page 167: ...5 1 MAINTENANCE...
Page 189: ...5 23 MEMO...
Page 209: ...5 43 MEMO...
Page 231: ...6 1 TROUBLESHOOTING...
Page 250: ...6 20...
Page 251: ...7 1 SPECIFICATIONS...
Page 253: ...7 3 MEMO...
Page 254: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS Cab MACHINE DIMENSIONS...
Page 256: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS Canopy...
Page 258: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 260: ...7 10 MEMO...
Page 262: ...7 12 SPECIFICATIONS Long arm Cab LIFTING CAPACITIES...
Page 263: ...7 13 SPECIFICATIONS Long arm Cab LIFTING CAPACITIES...
Page 264: ...7 14 SPECIFICATIONS Long arm Canopy LIFTING CAPACITIES...
Page 265: ...7 15 SPECIFICATIONS LIFTING CAPACITIES Long arm Canopy...
Page 266: ...7 16 SPECIFICATIONS Standard arm Cab LIFTING CAPACITIES...
Page 267: ...7 17 SPECIFICATIONS Standard arm Cab LIFTING CAPACITIES...
Page 268: ...7 18 SPECIFICATIONS Standard arm Canopy LIFTING CAPACITIES...
Page 269: ...7 19 SPECIFICATIONS LIFTING CAPACITIES Standard arm Canopy...
Page 270: ...7 20...
Page 271: ...8 1 OPTIONS...
Page 279: ...8 9 MEMO...
Page 284: ...8 14 OPTIONS CAB OPTIONS CAB OPTIONS 1 Front guard 2 Emergency hammer 3 Front light Right...
Page 295: ...8 25...
Page 296: ...8 26...