![background image](http://html2.mh-extra.com/html/takeuchi/tb225/tb225_operators-manual_3342967190.webp)
5-24
MAINTENANCE
AFTER THE INITIAL 50 HOURS (ONLY FOR NEW MACHINES)
1. Move the sheet all the way forward.
2. Take out four bolts and remove the cover
(1).
3. Press at the center of the fan pulley (1)
and alternator pulley (2) to check the
tension (approx. 98 N or 22 lbf).
The slack (A) should be 7 to 10 mm (0.28
to 0.4 in).
4. Inspect the fan belt (3) and replace if it is
as follows.
· There are cuts or cracks.
· The belt is worn and touches the bottom
of the V groove in the pulley.
· The belt stretched too loose to be
adjusted.
AFTER THE INITIAL 50 HOURS
(ONLY FOR NEW MACHINES)
INSPECTING AND ADJUSTING THE FAN
BELT
Stop the engine and allow the machine to
cool down before performing
maintenance.
• The engine, muffler, radiator, hydraulic
lines, sliding parts and many other parts
of the machine are hot immediately after
the engine is stopped. Touching these
parts will cause burns.
IMPORTANT: The loose belts could result
in bad battery charge, overheat of engine
or early wear of belt. Too tight belts could
damage the water pump or bearing and
belt used to drive the alternator.
IMPORTANT: Do not let any oil or grease
get on the belt.
Inspection
Summary of Contents for TB225
Page 1: ......
Page 7: ...0 5...
Page 12: ...0 10...
Page 13: ...1 1 SAFETY...
Page 52: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 53: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 54: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 55: ...1 43 SAFETY SAFETY SIGNS DECALS...
Page 56: ...1 44...
Page 57: ...2 1 CONTROLS...
Page 69: ...2 13 MEMO...
Page 105: ...2 49 MEMO...
Page 131: ...3 1 OPERATION...
Page 161: ...4 1 TRANSPORT...
Page 165: ...4 5 TRANSPORT HOISTING THE MACHINE Two point suspension Three point suspension...
Page 167: ...5 1 MAINTENANCE...
Page 189: ...5 23 MEMO...
Page 209: ...5 43 MEMO...
Page 231: ...6 1 TROUBLESHOOTING...
Page 250: ...6 20...
Page 251: ...7 1 SPECIFICATIONS...
Page 253: ...7 3 MEMO...
Page 254: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS Cab MACHINE DIMENSIONS...
Page 256: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS Canopy...
Page 258: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 260: ...7 10 MEMO...
Page 262: ...7 12 SPECIFICATIONS Long arm Cab LIFTING CAPACITIES...
Page 263: ...7 13 SPECIFICATIONS Long arm Cab LIFTING CAPACITIES...
Page 264: ...7 14 SPECIFICATIONS Long arm Canopy LIFTING CAPACITIES...
Page 265: ...7 15 SPECIFICATIONS LIFTING CAPACITIES Long arm Canopy...
Page 266: ...7 16 SPECIFICATIONS Standard arm Cab LIFTING CAPACITIES...
Page 267: ...7 17 SPECIFICATIONS Standard arm Cab LIFTING CAPACITIES...
Page 268: ...7 18 SPECIFICATIONS Standard arm Canopy LIFTING CAPACITIES...
Page 269: ...7 19 SPECIFICATIONS LIFTING CAPACITIES Standard arm Canopy...
Page 270: ...7 20...
Page 271: ...8 1 OPTIONS...
Page 279: ...8 9 MEMO...
Page 284: ...8 14 OPTIONS CAB OPTIONS CAB OPTIONS 1 Front guard 2 Emergency hammer 3 Front light Right...
Page 295: ...8 25...
Page 296: ...8 26...