CONTROLS
Connecting the hydraulic circuits
To connect the attachment hydraulic lines,
observe the following procedures:
1. Release the pressure remaining in the
lines, and then close the stop valve.
Refer to “Releasing the residual pressure”
on page 2-68.
2. Remove the plugs.
3. Connect the attachment hydraulic lines to
ports (a/c) and (b/d). When installing a
hydraulic breaker, connect the supply
circuit to the port (a) and the return circuit
to port (b).
4. Open the stop valves. When installing a
hydraulic breaker, open the selector valve
(1).
Refer to “Selector valve” on page 2-69.
5. When connecting is complete, purge air
from the hydraulic lines.
a. Start the engine and run it at a low idle
speed with no load for 10 minutes.
b. With the engine running in low idle,
operate the auxiliary hydraulic switches
repeatedly (approx. 10 times) to purge
air from the hydraulic lines.
c. Stop the engine and wait for at least 5
minutes until bubbles escape from the
hydraulic oil in the tank.
IMPORTANT: Follow the procedures for
purging air as instructed by the
attachment manufacturer, if applicable.
6. Check for oil leaks.
Disconnecting the hydraulic circuits
1. Release the pressure remaining in the
lines, and then close the stop valve.
Refer to “Releasing the residual pressure”
on page 2-68.
2. Disconnect the lines from the ports (a/c)
and (b/d).
3. Install the plugs.
ACCESSORIES
Summary of Contents for TB225
Page 1: ......
Page 7: ...0 5...
Page 12: ...0 10...
Page 13: ...1 1 SAFETY...
Page 52: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 53: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 54: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 55: ...1 43 SAFETY SAFETY SIGNS DECALS...
Page 56: ...1 44...
Page 57: ...2 1 CONTROLS...
Page 69: ...2 13 MEMO...
Page 105: ...2 49 MEMO...
Page 131: ...3 1 OPERATION...
Page 161: ...4 1 TRANSPORT...
Page 165: ...4 5 TRANSPORT HOISTING THE MACHINE Two point suspension Three point suspension...
Page 167: ...5 1 MAINTENANCE...
Page 189: ...5 23 MEMO...
Page 209: ...5 43 MEMO...
Page 231: ...6 1 TROUBLESHOOTING...
Page 250: ...6 20...
Page 251: ...7 1 SPECIFICATIONS...
Page 253: ...7 3 MEMO...
Page 254: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS Cab MACHINE DIMENSIONS...
Page 256: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS Canopy...
Page 258: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 260: ...7 10 MEMO...
Page 262: ...7 12 SPECIFICATIONS Long arm Cab LIFTING CAPACITIES...
Page 263: ...7 13 SPECIFICATIONS Long arm Cab LIFTING CAPACITIES...
Page 264: ...7 14 SPECIFICATIONS Long arm Canopy LIFTING CAPACITIES...
Page 265: ...7 15 SPECIFICATIONS LIFTING CAPACITIES Long arm Canopy...
Page 266: ...7 16 SPECIFICATIONS Standard arm Cab LIFTING CAPACITIES...
Page 267: ...7 17 SPECIFICATIONS Standard arm Cab LIFTING CAPACITIES...
Page 268: ...7 18 SPECIFICATIONS Standard arm Canopy LIFTING CAPACITIES...
Page 269: ...7 19 SPECIFICATIONS LIFTING CAPACITIES Standard arm Canopy...
Page 270: ...7 20...
Page 271: ...8 1 OPTIONS...
Page 279: ...8 9 MEMO...
Page 284: ...8 14 OPTIONS CAB OPTIONS CAB OPTIONS 1 Front guard 2 Emergency hammer 3 Front light Right...
Page 295: ...8 25...
Page 296: ...8 26...