82
OPERATION
Machine Operation
Operating the Arm
To contract the arm:
Tilt the left operating lever backward.
To extend the arm:
Tilt the left operating lever forward.
Operating the Bucket
To dig:
Tilt the right operating lever to the left.
To dump:
Tilt the right operating lever to the right.
Operating the Boom Swing
To swing left:
Press the left side of the pedal.
To swing right:
Press the right side of the pedal.
Operating the Intermediate Boom
To raise the intermediate boom:
Press the selector switch and step on the
left side of the pedal.
To lower the intermediate boom:
Press the selector switch and step on the
right side of the pedal.
Operating the Dozer Blade
To lower the dozer blade:
Tilt the lever forward.
To raise the dozer blade:
Tilt the lever backward.
W2D021
W2D024
W2D022
W2D023
W2D025
Summary of Contents for TB175W
Page 6: ...4...
Page 8: ...6...
Page 35: ...33 MEMO...
Page 98: ...96...
Page 103: ...101 TRANSPORT 2 Piece Boom Mono Boom Hoisting the Machine...
Page 168: ...166...
Page 171: ...169 MEMO...
Page 172: ...170 SPECIFICATIONS Machine Dimensions W2K0011 K R G J Q P M V W L N D H B C U S T E F A...
Page 174: ...172 SPECIFICATIONS Operating Range 2 Piece Boom W2K002 J E F G C D K H B A...
Page 176: ...174 SPECIFICATIONS Operating Range Mono Boom W2K003 J K H B A D G F E C...
Page 178: ...176 MEMO...
Page 184: ...182...
Page 212: ...210...
Page 213: ...211 INDEX...