102
TRANSPORT
Cautions on Transporting
WARNING
�
Know and follow the safety rules, vehicle
code and traffic laws when transporting
the machine.
�
Consider the length, width, height and
weight of the truck and trailer with the
machine loaded on it when determining
the best route.
CAUTION
If the machine is to be transported
complete, by sea, for example, the special
tie bar provided by the manufacturer is to
be used.
For enquiries, contact the manufacturer.
Dimensions for transportation by low
loader and rail
For rail transport, the machine is to be carried
on a suitable type of wagon.
Information of loading procedures is available
from the relvant rail authorities.
For road or rail transport, the upperstructure
must be locked in position using the
mechanism located near the operator’s seat
in order to prevent slewing; the slewing brake
must be on; and the wheels must be chocked.
Any attached equipment is to rest on the floor
of the transporter.
Road Travel Posture
2-Piece Boom
Mono-Boom
4000mm / 157.5 in.
W2F006
3500mm / 137.8 in.
Summary of Contents for TB175W
Page 6: ...4...
Page 8: ...6...
Page 35: ...33 MEMO...
Page 98: ...96...
Page 103: ...101 TRANSPORT 2 Piece Boom Mono Boom Hoisting the Machine...
Page 168: ...166...
Page 171: ...169 MEMO...
Page 172: ...170 SPECIFICATIONS Machine Dimensions W2K0011 K R G J Q P M V W L N D H B C U S T E F A...
Page 174: ...172 SPECIFICATIONS Operating Range 2 Piece Boom W2K002 J E F G C D K H B A...
Page 176: ...174 SPECIFICATIONS Operating Range Mono Boom W2K003 J K H B A D G F E C...
Page 178: ...176 MEMO...
Page 184: ...182...
Page 212: ...210...
Page 213: ...211 INDEX...