79
OPERATION
Machine Operation
Site Travel Posture
Fold the hoe equipment and lower it to 30
to 40 cm (12 to 16 in.) above the ground.
3. Engage the swing lock.
Traveling Forward and Backward
1. Increase the engine speed.
2. Set the safety lock lever to the released
position.
3. Press the safety lock button to lock the
operating levers.
4. Engage the blade lever and boom swing
pedal locks.
5. Press the axle lock switch down to
disengage the axle lock.
6. Press the site travel switch down to choose
the proper speed.
7. Press the parking brake switch down to
disengage the parking brake.
8. Operate the travel pedals as described
below.
W2D007
W2D011
W2D026
W3D050
W3D0401
Summary of Contents for TB175W
Page 6: ...4...
Page 8: ...6...
Page 35: ...33 MEMO...
Page 98: ...96...
Page 103: ...101 TRANSPORT 2 Piece Boom Mono Boom Hoisting the Machine...
Page 168: ...166...
Page 171: ...169 MEMO...
Page 172: ...170 SPECIFICATIONS Machine Dimensions W2K0011 K R G J Q P M V W L N D H B C U S T E F A...
Page 174: ...172 SPECIFICATIONS Operating Range 2 Piece Boom W2K002 J E F G C D K H B A...
Page 176: ...174 SPECIFICATIONS Operating Range Mono Boom W2K003 J K H B A D G F E C...
Page 178: ...176 MEMO...
Page 184: ...182...
Page 212: ...210...
Page 213: ...211 INDEX...