Running Experiments
3–10
TA I
NSTRUMENTS
TGA 2050
Loading the Sample
After taring the sample pan, load the sample into
the TGA furnace as follows:
1. Place the sample in the sample pan, and
position the pan on the sample platform
(Figure 3.2).
The wire on the bottom of the sample pan
should align with the groove in the panhole,
so that the sample pan can be picked up by
the sample hang-down wire.
Always use brass tweezers to handle the sample
pans.
Manually loading the sample pan onto the hang-
down wire may damage the balance mechanism.
Figure 3.2
Sample Pan
Ready to Load
NOTE:
t
CAUTION:
Summary of Contents for TGA 2050
Page 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Page 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Page 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Page 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Page 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Page 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Page 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...