Index
TA I
NSTRUMENTS
TGA 2050
I–2
F
fittings
cooling gas 2-19
purge 2-17
flow rates 3-17
forced start 3-20
FURNACE
key 1-7, 1-9
furnace 4-9
air cool 3-18
supply valve 3-18
furnace base 4-10
furnace tube
cleaning 5-4
fuses 5-12
location 5-12
G
gas 3-16
purge 3-15
using the TGA in an oxygen-free
environment 3-23
Gas Switching Accessory 1-10
using 3-18
GPIB
cable 2-14
H
hang-down wire assemblies 4-7
hang-down wires
aligning 2-27
installing 2-23, 2-24
Heat Exchanger 4-13
cables 2-12
components 4-13
filling 2-10
maintenance 5-7
maintaining coolant level 5-7
water lines 2-12
water reservoir 5-7
Heat Exchanger Water Line Connec-
tions 2-14
Heating (status code) 4-16
Holding (status code) 4-16
Hot (status code) 4-16
I
Initial (status code) 4-17
Inspection 2-8
installation
hang-down wires 2-23
instrument
keypad 1-7, 1-8
setup 3-24
shutting down 2-33
Summary of Contents for TGA 2050
Page 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Page 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Page 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Page 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Page 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Page 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Page 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...