TA I
NSTRUMENTS
TGA 2050
2–7
Installing the
Instrument
Before shipment, the TGA 2050 instrument is
inspected both electrically and mechanically so
that it is ready for operation upon proper instal-
lation. Installation involves the following
procedures, described in this chapter:
•
Unpacking the instrument and its
components and accessory kit
•
Inspecting the system for shipping
damage and missing parts
•
Filling the heat exchanger
•
Connecting the TGA to the TA
Instruments controller
•
Connecting the heat exchanger cable and
water lines, purge gas lines, accessories,
and power cable
•
Unpacking the balance
•
Installing the hang-down wires
•
Leveling the instrument and aligning the
hang-down wires
•
Adjusting the sample platform.
If you wish to have your TGA installed by a TA
Instruments Service Representative, call for an
installation appointment when you receive your
instrument.
To avoid mistakes, read this entire chapter
before you begin installation.
Installing the Instrument
t
t
t
t
t
CAUTION:
Summary of Contents for TGA 2050
Page 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Page 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Page 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Page 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Page 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Page 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Page 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...