TA I
NSTRUMENTS
TGA 2050
2–1
CHAPTER 2: Installing the
TGA 2050
Unpacking/Repacking the 2050 .................. 2-3
Unpacking the 2050 ............................. 2-3
Repacking the 2050 .............................. 2-6
Installing the Instrument ............................ 2-7
Inspecting the System .......................... 2-8
Choosing a Location ........................... 2-9
Filling the Heat Exchanger ................ 2-10
Connecting Cables and Lines ............ 2-12
Heat Exchanger Cable
and Water Lines .......................... 2-12
GPIB Cable ................................. 2-14
Purge Lines ................................. 2-17
Cooling Gas Line ........................ 2-19
Power Cable ................................ 2-20
Unpacking the Balance ............................ 2-21
Installing the Hang-Down Wires ....... 2-23
Aligning the Sample
Hang-Down Wire .............................. 2-27
Adjusting the Sample Platform ......... 2-31
Summary of Contents for TGA 2050
Page 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Page 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Page 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Page 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Page 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Page 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Page 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...