Index
TA I
NSTRUMENTS
TGA 2050
I–5
TGA 2050
(contd)
installing 2-7
keypad 1-6, 1-7, 1-8
location of 2-9
maintenance 5-4
parts list 5-16
power failures 5-13
power problems 5-12
purge fittings 4-11
repacking 2-6
replacement parts 5-16
replacing thermocouple 5-10
running an experiment 3-6
sample loading assembly 4-8
sample tube 4-9
setting up an experiment 3-14
shutting down 2-33
specifications 1-11
starting 2-32
test functions 5-14
theory of operation 4-14
thermocouple
position of 5-11
removing 5-11
unpacking 2-3
installing mounting feet 2-5
using in an oxygen-free environ-
ment 3-23
weight ranges 4-3
Theory of Operation 4-14
thermocouple 4-10
adjusting 3-11
removing 5-10
replacing 5-10
U
UNLOAD
key 1-7
Unload (status code) 4-19
unpacking
balance 2-21
W
wires
hang-down 2-23
aligning 2-27
Summary of Contents for TGA 2050
Page 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Page 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Page 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Page 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Page 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Page 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Page 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...