
Installation and electrical connections
Page 22/52
Installation, commissioning and operating instructions
SYCLOPE
TERE’O Touch
®
CU/PT
Warning: tank level management is not enabled by default. Refer to the programming section of
the manual to enable tank level management on the pH input and/or Chlorine / Bromine input.
a)
Tank level input pH (K1) :
Use a 2 points cable.
Strip the wires for 7 mm.
Pass the cable through a cable gland.
Wire the two points of switch to
K1 (+) (16)
and
K1(sw) (17)
.
Tighten the cable gland to ensure tightness.
b)
Tank level chlorine/bromine (K2) :
Use a 2 points cable.
Strip the wires for 7 mm.
Pass the cable through a cable gland.
Wire the two points of switch to
K2 (+) (27)
and
K2 (sw) (28)
.
Tighten the cable gland to ensure tightness.
switch
switch