AMU Powercon
Program List and Explanations
A-96.250.331 / 230320
51
The point of intersection of the tangent with the respective axis will
result in the parameters a and L.
Consult the manual of the control unit for connecting and program
-
ming details. Choose control upwards or downwards.
Control upwards or downwards
Setpoint:
User-defined process value for the selected parameter.
P-Band:
Range below (upwards control) or above (downwards con
-
trol) the set-point, within the dosing intensity is reduced from 100%
to 0% to reach the setpoint without overshooting.
5.2.1.43
Control Parameters: if Parameters = Conductivity
5.2.1.43.10
Setpoint
Range: 0
S–300 mS
5.2.1.43.20
P-Band:
Range: 0
S–300 mS
5.2.1.43
Control Parameters: if Parameters = Temperature
5.2.1.43.11
Setpoint
Range: -25 to +270 °C
5.2.1.43.21
P-Band:
Range: 0 to +100 °C
A
B
X
Response to maximum control output
Tangent on the inflection point
Time
Xp
Tn
Tv
= 1.2/a
= 2L
= L/2
X
Y
B
A
L
a