22
A-96.250.441 / 060619
AMU pH-Redox
Installation
3.
Installation
3.1.
Installation Checklist Monitors
Check
Instrument’s specification must conform to your power ratings.
Do not switch on power until all external devices are connected.
Installation
The transmitter is intended for panel mounting. The dimensions
are shown in
Dimensions of the AMU Transmitter, p. 23
Electrical Con-
nections
Connect all external devices, see
.
Connect the power cord, but do not switch on power until all
external devices are connected.
pH/ORP
sensor
or
.
Connect the sensor cables.
Store the protective caps for later use.
Power-up
Turn on the sample flow and wait until the flow cell is completely
filled.
Switch on power.
First, the transmitter performs a self test, displays the firmware
version and then starts normal operation.
Instrument
set-up
Adjust sample flow. Program all parameters for sensor and
external devices (interface, recorders, etc.). Program all param-
eters for instrument operation (limits, alarms).
Run-in period
Let the instrument run continuously for 1 h.
pH sensor
calibration
Perform standard calibration or process calibration according to
ORP sensor
calibration
Perform standard calibration or process calibration according to