
A-96.250.671 / 070222
AMI Silica
Maintenance
48
6.
Maintenance
6.1. Maintenance Schedule
6.2. Stop of Operation for Maintenance
1
Put suction lances into a bucket with demineralized water.
2
Start fill system.
3
Wait until the peristaltic pump has stopped.
4
Stop sample flow.
5
Wait until the constant head is empty.
6
Put suction lances into an empty bucket
7
Shut off power of the instrument.
Weekly
Check sample supply for dirt.
Check sample flow.
Monthly
Check reagent level.
Every 6 months
Exchange reagent pump tube.
By occurrence:
E020, FOME dirty:
Cleaning the Photometer, p. 56
E022, Reagent empty: