
A-96.250.671 / 070222
AMI Silica
Instrument Setup
37
4.
Instrument Setup
4.1. Activate the Peristaltic Pump
The occlusion frames of the peristaltic pump are opened during
transport and storage. This prevents the pump tubes from sticking
together at the pressure points.
1
Turn the occlusion frame [B] clockwise to activate the peristaltic
pump.
The peristaltic pump is ready.
4.2. Prepare Reagents
See
Refill or replace Reagents, p. 49
.
1
Insert the suction lances into the containers.
Make sure that the numbers on the suction lances correspond
to the numbers on the containers
.
A
B
C
D
Turn clockwise to activate
Occlusion frame
Rotor
Pump tube
A
B
D
C