3-10 ENGINE
• Install the gearshift lever to the gearshift shaft in the correct
position.
• Tighten the engine sprocket nut to the specified torque and bend
up the lock washer to lock the nut.
• Tighten the rear axle nut, exhaust pipe clamp bolts, exhaust
pipe mounting bolt and muffler mounting bolt to the specified
torque. (
!
7-29)
• After remounting the engine, route wiring harnesses, cables and
hoses properly by referring to the sections, for wire routing, cable
routing and hose routing. (
!
7-11 through -24)
• Adjust the following items to the specification.
Page
* Throttle cable play .......................................................... 2-10
* Idling adjustment ............................................................ 4-10
* Carburetor synchronization ............................................ 4-22
* Drive chain ..................................................................... 2-12
• Pour 4.6 L of engine oil SAE 10W/40 graded SF or SG into the
engine after overhauling engine.
• Start up the engine and allow it to run for several minutes at idle
speed. About three minutes after stopping engine, check that
the oil level remains between the marks of oil level inspection
window.
Change
3 300 ml
Filter change
3 500 ml
Overhaul
4 600 ml
Summary of Contents for GSX1200 1999
Page 1: ......
Page 33: ...2 20 PERIODIC MAINTENANCE...
Page 85: ...3 50 ENGINE...
Page 91: ...3 56 ENGINE BOND 1207B should be applied to the following locations The line of BOND...
Page 105: ...3 70 ENGINE 24th pin 1st pin...
Page 134: ...FUEL AND LUBRICATION SYSTEM 4 25 ENGINE LUBRICATION SYSTEM CHART...
Page 135: ...4 26 FUEL AND LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM...
Page 136: ...FUEL AND LUBRICATION SYSTEM 4 27 CYLINDER HEAD COOLING SYSTEM CHART...
Page 137: ...4 28 FUEL AND LUBRICATION SYSTEM CYLINDER HEAD COOLING SYSTEM...
Page 246: ...7 10 SERVICING INFORMATION WIRING DIAGRAM...
Page 261: ...SERVICING INFORMATION 7 25 SEAT TAIL COVER INSTALLATION...
Page 273: ...SERVICING INFORMATION 7 37...
Page 274: ......