24 VZ800L0 (’10-MODEL)
*1 Set the lead wire under the starter relay.
*6
Do not contact the plug cap with cylinder head
cover cap.
*2 Set the couplers inside of the frame.
*7 Pass the lead wire over the engine mounting bracket.
*3
Pass the HO2 sensor lead wire inside of the
cover.
*8 Pass the ECM harness inside of the frame.
*4
Fix the wiring harness with the clamp firmly.
Do not contact the tip of clamp with air cleaner.
*9
Do not pinch the fuel tank coupler between the main
wire harness and fuel tank when installing the fuel tank.
*5
Pass the lead wires under the frame.
Do not contact the lead wires with fuel tank.
To brake
switch,
etc.
To Horn
To horn
Reservoir
hose
Indicator lamp
harness
Clamp
Frame
Clamp
IAT sensor
Battery
lead wire
Horn
Frame
Wiring harness
Radiator
FWD
Shroud
Turn
down.
*3
TO sensor
To HO2 sensor
Air cleaner
No use.
28 mm
(1.1 in)
IG coil lead wire
High tension cord
Clamp
Clutch cable
*2
Wiring harness
Protector
To HO2 sensor
*4
50 – 80 mm
(2.0 – 3.1 in)
*5
Clamp
Fuel tank
Frame
0 – 20 mm
(0 – 0.8 in)
*6
*7
Clamp
Clamp
*8
High tension cord
*1
*9
Summary of Contents for 2010 VZ800L0
Page 1: ......
Page 41: ...Prepared by August 2009 Part No 99501 38110 01E Printed in Japan 40...
Page 42: ......