
10.18.2
MODELS T60, T75 AND T120 – OLD AXLE
The old axle or part of the wheel has to be removed so that the axle can be pushed out from the
holder on the frame. Use a reciprocating saw, grinder or drill off the axle from the side where the
wheel is so that the wheel can be removed.
If possible level the material inside the cylinder.
Switch of the electrical supply.
Remove the covers where appropriate.
Place support under the cylinder
allowing the wheel to be removed
without the cylinder tilting.
Loosen the bolt that holds the axle Ø 25
mm. Tighten it loosely again.
Cut the axle that the wheel is on which is
Ø 25 mm between the wheel and the
holder on the frame.
The damaged wheel will fall down.
Take away the M12 that has been
holding the axle.
Clear away all old parts.
Put in the socket which is Ø 25 mm x 50
mm where the old axle where positioned.
Take the new wheel and put in the stub shaft so that it sticks out 4 mm on the other side.
Put the wheel and the axle in the right position and continue to push the axle in to the socket
which is in the hole of the axle.
Assemble and tighten the M12.
Switch on power and test run before putting the covers back on.
10.18.3
MODEL T240
If possible level the material inside the cylinder.
Switch of the electrical supply.
Remove the covers where appropriate.
Place support under the cylinder allowing the
wheel to be removed without the cylinder
tilting.
Loosen the circlips holding the wheel axle in
position.
Push the axle from its position and remove the
wheel.
Replace the wheel and axle.
Switch on power and test run before putting
the covers back on.
Summary of Contents for BIGHANNA T120
Page 8: ......
Page 28: ......
Page 32: ......
Page 80: ...5 3 1 START UP SCHEDULE MODEL T60 RESTAURANT WASTE...
Page 81: ......
Page 82: ...5 3 2 START UP SCHEDULE MODEL T120 RESTAURANT WASTE...
Page 83: ......
Page 84: ...5 3 3 START UP SCHEDULE MODEL T240 RESTAURANT WASTE...
Page 85: ......
Page 86: ......
Page 94: ......
Page 114: ......