
8.2.2
CHECK-UP WEEKLY MODELT240
⇒
NOTE THAT THE FAN IS WORKING
⇒
CLEAR VENTILATION
⇒
NOTE TEMPERATURE ON TOUCH SCREEN
If the temperature in the hot zone has dropped significantly check moisture, colour, smell, filling
level of material inside cylinder and airflow to and from cylinder. Add pellets/sawdust, empty
cylinder, clear ventilation and/or adjust settings accordingly.
⇒
INSPECT THE PROCESSED MATERIAL AND MAKE SURE THAT THE MATERIAL IS NOT TOO WET
OR DRY.
⇒
EMPTY BIN ON OUTLET IF NECESSARY
⇒
IF A BIOFILTER IS INSTALLED – EMPTY THE BIOFILTER USING THE
BALL VALVE.
Summary of Contents for BIGHANNA T120
Page 8: ......
Page 28: ......
Page 32: ......
Page 80: ...5 3 1 START UP SCHEDULE MODEL T60 RESTAURANT WASTE...
Page 81: ......
Page 82: ...5 3 2 START UP SCHEDULE MODEL T120 RESTAURANT WASTE...
Page 83: ......
Page 84: ...5 3 3 START UP SCHEDULE MODEL T240 RESTAURANT WASTE...
Page 85: ......
Page 86: ......
Page 94: ......
Page 114: ......