Chapter 2: Server Installation
2-5
Installing the Chassis Rails
Position the fixed chassis rail sections you just removed along the side of
the 5012B-6/5012B-E chassis making sure the five screw holes line up.
Note that these two rails are left/right specific. Screw the rail securely to
the side of the chassis (see Figure 2-2). Repeat this procedure for the
other rail on the other side of the chassis. You will also need to attach the
rail brackets when installing into a telco rack.
Locking Tabs:
As you have seen, both chassis rails have a locking tab,
which serves two functions. The first is to lock the server into place
when installed and pushed fully into the rack, which is its normal position.
Secondly, these tabs also lock the server in place when fully extended
from the rack. This prevents the server from coming completely out of
the rack when you pull it out for servicing.
Figure 2-2. Installing Chassis Rails
Installing the Rack Rails
Determine where you want to place the SuperServer 5012B-6/5012B-E in
the rack (see Rack and Server Precautions in Section 2-3). Position the
fixed rack rail/sliding rail guide assemblies at the desired location in the
rack, keeping the sliding rail guide facing the inside of the rack. Screw the
Summary of Contents for SuperServer 5012B-6
Page 1: ...SUPER SUPERSERVER 5012B 6 SUPERSERVER 5012B E USER SMANUAL Revision 1 1...
Page 5: ...Notes Table of Contents v...
Page 10: ...SUPERSERVER 5012B 6 5012B E User s Manual x Notes...
Page 18: ...SUPERSERVER 5012B 6 5012B E Manual 1 8 Notes...
Page 30: ...2 12 SUPERSERVER 5012B 6 5012B E Manual Notes...
Page 47: ...Chapter 5 Advanced Motherboard Setup 5 9 Figure 5 7 Adding PCI Cards...
Page 64: ...5 26 SUPERSERVER 5012B 6 5012B E Manual Notes...
Page 74: ...6 10 SUPERSERVER 5012B 6 5012B E Manual Notes...
Page 110: ...B 6 SUPERSERVER 5012B 6 5012B E Manual Notes...