SUPER 370SBA/370SBM/370SLA/370SLM
User’s Manual
B-6
Check
Point
Description
60
The DMA page register test passed. Performing the
DMA Controller 1 base register test next.
62
The DMA controller 1 base register test passed.
Performing the DMA controller 2 base register test next.
65
The DMA controller 2 base register test passed.
Programming DMA controllers 1 and 2 next.
66
Completed programming DMA controllers 1 and 2.
Initializing the 8259 interrupt controller next.
7F
Extended NMI source enabling is in progress.
80
The keyboard test has started. Clearing the output
buffer and checking for stuck keys. Issuing the
keyboard reset command next.
81
A keyboard reset error or stuck key was found. Issuing
the keyboard controller interface test command next.
82
The keyboard controller interface test completed.
Writing the command byte and initializing the circular
buffer next.
83
The command byte was written and global data
initialization has been completed. Checking for a
locked key next.
84
Locked key checking is over. Checking for a memory
size mismatch with CMOS RAM data next.
85
The memory size check is done. Displaying a soft error
and checking for a password or bypassing WINBIOS
Setup next.
86
The password was checked. Performing any required
programming before WINBIOS Setup next.
Summary of Contents for SUPER 370SBA
Page 10: ...x SUPER 370SBA 370SBM 370SLA 370SLM User s Manual ...
Page 30: ...SUPER 370SBA 370SBM 370SLA 370SLM User s Manual 1 20 ...
Page 42: ...2 12 SUPER 370SBA 370SBM 370SLA 370SLM User s Manual ...
Page 50: ...3 8 SUPER 370SBA 370SBM 370SLA 370SLM User s Manual ...
Page 76: ...SUPER 370SBA 370SBM 370SLA 370SLM User s Manual 5 22 ...
Page 92: ...SUPER 370SBA 370SBM 370SLA 370SLM User s Manual B 10 ...