6-9
Chapter 6: Rack Installation
Figure 6-6. Installing the Rack Rails
Note
: Figures are for illustrative purposes only. Always install servers into racks
from the bottom up.
3. Secure the front side of the outer rail with two M5 screws and the rear side
of the outer rail with three M5 screws.
Note:
The outer rail is adjustable from
approximately 26" to 38.25".
4. Repeat steps 1-3 for the left outer rail.
Stability hazard
. The rack stabilizing mechanism must be in place, or the
rack must be bolted to the floor before you slide the unit out for servicing.
Failure to stabilize the rack can cause the rack to tip over.