A+ Server AS -4124GO-NART/AS -4124GO-NART+ User's Manual
36
1. Gently lower the Force Frame down onto the Rail Frame and hold it in place until it is
seated in the Socket housing. Note that the Force Frame is spring loaded and has to be
held in place before it is secured.
Important: Use a torque screwdriver, set it at 16.1
kgf-cm (14.0 lbf-in) with a Torx T20 screw head bit, to prevent damage to the CPU.
2. Place and re-screw the screws in the reverse order to the way you removed them (holes
1-2-3 in order). When finished, the Force Frame will be secure over both the Rail Frame
and CPU Package.