Series Premier VS-VH
Page 20
LT135 Dec 2019
Assembly Overview Notes
Generally, there is no unique sequence for installation of the Premier VS-VH system. A review of the job site will
often indicate a logical installation order. However, it is typical to start at the end of the branch with the furthest
Burner location and continue that Branch downstream towards the Vacuum Pump, then begin again with the next
Branch. Generally, 10 ft. (3 m) increments of Tube and Reflector can be used until one reaches the Common
Tailpipe areas or Vacuum Pump connections. The general order of material in this manual is recommended for low-
hassle installation purposes.
The Installation of the Entire System potentially consists of 5 individual Parts, one Part for each major
component/system:
1. Radiant Line System, (Heat Exchangers)
2. Vacuum Pumps and Ventilation Systems,
3. Optional Combustion Air Supply System,
4. Gas Supply System, and
5. Electrical System(s)
Directions for the installation of each component/system are therefore found in the respective sections
along with general information and safety notes as required.
1. Radiant Line System
For the purpose of this section the term “Radiant Line System” will refer only to the main heat exchanging
components: Tubes, Burners, Reflectors, Tailpipes and attached Optional pieces. These must be hung from ceiling
supports and form the main Radiant Lines and Branches of the Heat Exchanger System.
Installation of the Radiant Line System has been divided into 6 main parts as follows:
Radiant Line Tubes
Tailpipe Tubes
Burners
Reflectors
Optional Shield Equipment
Optional Deco-Grille
The order they are listed in is recommended for ease of installation and allows for adjustments to be made easily if
required. Other orders of installation are possible; please note that there are certain components which, once
installed, will make it more difficult to install others. Thoroughly read through the following installation directions for
details on individual components.
Figure 9 illustrates the relationship of many of the various components of the Radiant Line System and will be a
useful reference at many times during the installation.
NOTE: Close all open ended “S” hooks and turnbuckles to avoid unhooking chain with inadvertent contact.
NOTE: The Premier VS-VH System does not typically require the use of Baffles, if Baffles are desired
please consult with the Manufacturer (SRP) prior to installation.