Series Premier VS-VH
Page 29
LT135 Dec 2019
Figure 20: View of System after Installation of Burners
D - Reflectors
1. Install Reflectors
after
any Tube Couplings and J-bolts they cover have been installed. (For ease of installation
it is suggested to install Burners
before
the Reflectors; however, it is possible to do the reverse.)
2. *If the System Plan includes
Bottom Shields these MUST be put on before the Reflectors
as there will be
limited access afterwards. For details see Section E - Optional Shield Equipment.
3. Begin the first Reflector after a Burner with an End Cap about 3” (7.6 cm) downstream of the Burner as shown
in Figure 21 and Figure 22. Install the End Cap using #8 x 3/8” screws. Leaving space in the Reflector run
allows unimpeded installation and servicing of the Burner.
4. Install Reflector Brackets. Place one at each Reflector overlap position and one in the middle of each 10 ft. (3
m) Reflector length. Secure the Brackets loosely with #8 x 3/8” screws.
Tighten only
the screws for Brackets in
the centre of alternating Reflectors and at every second overlap location. The remaining Reflector Bracket
screws are left loose to accommodate system movement/expansion. Refer to Figure 24 and to Figure 9 for a
visual of which bolts to tighten and which to leave loose.
5. Continue to slide the Reflectors into place within the Tube/Reflector Hanger up to the next Burner position.
Overlap the Reflectors as shown in Figure 9 and Figure 24.
Note: Reflectors should overlap adjacent reflectors 4" to 6". Be sure not to tile reflector sections; that is,
reflector sections must be either above both adjacent reflector sections or below both adjacent reflector
sections.