Series Premier VS-VH
Page 22
LT135 Dec 2019
Figure 10: Ceiling Mounting/Hanging Options
3. Install an End Vent Cap at the beginning of each Branch (open end of the first Combustion Tube) and fasten it
with a #8 x 3/8” screw as shown in Figure 11 below.
Figure 11: End Vent Cap Orientation
4. Fasten the Reflector Hanger to the end of the hanging chain and place the Tube in the hanger. Ensure that
Combustion Tubes have the Burner mounting hole positioned at 12 o’clock and facing downstream. (Refer to
Figure 12).