2.3 Illustration of flow configuration
2.3.1 Piping of flow-through chamber
Assemble the couplings according to following illustration
2.3.2 Piping of flow-through chamber(When install with a pH sensor)
When the flow-through chamber is installed with a pH sensor, be sure to install a ball
valve/connector which is included in the accessory part of 8-41 pH sensor housing at the spare
opening port(A) as the inlet of pH measurement chamber. Use a T-connector and tubing to
connect with the inlet piping and thus to make sure that both pH and free chlorine sensors
measure fresh and moving sample solution. Meanwhile, use the ball valves to adjust suitable
inlet flow to make inlet flow of pH measurement chamber less than inlet flow of free chlorine
measurement chamber, and make sure the level of inlet sample solution is higher than both
silver electrode of the free chlorine sensor and the front tip of the pH sensor.
Outlet: 3/8”
Inlet: 3/8”
Spare opening: 1/4 inch
(Can be used for clean or
sampling purpose. When
piping or sampling, please
remove the sealing plug.
(A)
(B)
Inlet
Inlet of pH
measurement chamber
Tubing of pH chamber is necessary
to be
longer
than it of free chlorine
chamber.
Inlet of free chlorine
measurement chamber
Shorter tubing
12