16-EN
INSTALLATION and OPERATION MANUAL
6.8.
Connection diagrams
Must be performed by an authorized service technician/service shop for such operations.
Diagram 17.
. Connection of Evacuated-tube collector VTC to solid fuel boiler WBS, combi tank KSC2 and three-way
valve