INSTALLATION and OPERATION MANUAL 

7. Commissioning 
 



 



Must be performed by an authorized service technician/service shop for such operations.  

 
 
Before commissioning of solar collector into operation, check: 

 

The air-tightness of all connections 

 

System air purging 

 

Insulation  of  pipelines:  must  be  UV  resistant  and  temperature  shock  proof  as  well  as  bird-  and 
rodent-proof in structure. 

 

Electrical connections: controller, pump 

 
 

 8. Damage prevention and service maintenance of collectors 

 



 



Any changes in design or construction of solar collectors are strictly prohibited. Detection of 
such  makes  warranty  null  and  void.  As  changes  in  design  and  construction  shall  be 
considered  the  removal  of  any  manufacturer-embedded  items,  incorporation  of  additional 
components in the collector, replacement  of any components with similar or analogues  not 
explicitly approved by the manufacturer.

 

 
8.1 

It  is  recommended  that  yearly  maintenance  be  carried  out  by  an  authorized  service. 

All  service 

maintenance must be logged on the warranty card. 

-

 

Checkup of operating pressure, pump operation, hydraulic connections. 

-

 

Checkup of heat carrier fluid, replacement thereof. 

 

8.2. Cleaning of collectors from dust deposits, fallen dry leaves and twigs 

Keeping the collector surface clean is a prerequisite for good performance. A dusty collector (due to lack of 
rainfall, dusty ambience) can be cleaned up in early morning hours before it is heated by sunlight using: 

-

 

Warm  water,  soap/glass  cleaner  solution  and  a  soft  cloth  when  the  collector  is  mounted  in  an 
easily accessible and safe place; 

-

 

Pressurized water jet when the collector is mounted in a hardly accessible place. 

-

 

 

8.3. Replacing of broken (damaged) VTC-tube  

In any event of broken collector tube it needs to be replaced as quickly as possible. Despite the damaged 
tube,  the  collector  can  still  operate,  but  its  efficiency  will  drop.  Clean  broken  glass  to  prevent  future 
injuries.  We  recommend  that  replacement  of  the  broken  collector  tube  be  carried  out  by  an  authorized 
installer / service observing all safety norms. 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for VTC 15

Page 1: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL SUNSYSTEM Solar Collectors EVACUATED TUBE COLLECTOR VTC Series Support system for Flat roof Inclined roof and Fa ade Model Serial Number v 0 1 1...

Page 2: ...TC Support system for Inclined roof 9 5 3 Installation of collector VTC Support system for Facade 11 5 4 Connecting multiple collector series 12 6 Connect the collector to the Hot Water System and or...

Page 3: ...label and the technical data see 12 in order to ensure proper operation of the product 1 2 1 Instructions to collector installer During installation and operation the country specific requirements an...

Page 4: ...inspection and cleaning of collector installation sites DANGER of slipping fall In most cases collectors are installed in hardly accessible and dangerous places We recommend that installation and serv...

Page 5: ...for perfect air tightness and reduced deposits accumulation possibility Heat Pipe technology is characterized by its high efficiency improved heat absorbing capacity of collector low heat losses and...

Page 6: ...placed As soon as the evacuated tubes are removed from the box please put on the rubber tube caps found inside the manifold box This will protect the bottom tip of the glass tube from breaking on impa...

Page 7: ...lues for wind load Vm mean wind speed does not exceed 150 km h and snow loads Sk weight of snow mass does not exceed 1 25 kN m according to ENV 1991 1 3 and 1991 1 4 Recommended orientation Facing the...

Page 8: ...tion Diagram 8 Installation is carried out by at least two people We recommend consulting with a roofing expert Fix the support onto the roof as indicated in the Collector Support Installation Instruc...

Page 9: ...ing expert Diagram 9 Step 1 Install the four fixing straps B to the roof using the screws G Diagram 10 Step 2 Put alongside and parallel to each other the two side rails F For each rail put two silico...

Page 10: ...side rails F while observing the correct weight distribution scheme Fix A and H to side rails F using two clamping clips C for each In this way the collector framework is composed Diagram 12 Once you...

Page 11: ...ive paste included in consignment kit The lower end of the tube must pass through tube holder D Place the plastic protector on the bottom of tube M Carefully screw the protector onto the holder Repeat...

Page 12: ...material expansion upon heating and contraction upon cooling Diagram 15 Number of collectors VTC type in one array Model Number of Collectors VTC 15 8 VTC 20 7 VTC 30 5 To prevent shading in two or mo...

Page 13: ...d to further strengthen the collector support fixation to the building structure as well as frequent inspection to prevent any loosening of connections Snow mass resistance load up to 30 cm 1 25 kN m...

Page 14: ...irculation pump should be also insulated otherwise it could be a source of heat loss 6 3 Stagnation temperature Stagnation refers to the condition that occurs when the pump stops running due to pump f...

Page 15: ...be designed to operate at a pressure of 500kPa achieved by use of a pressure limiting reduction value For the reliable operation of system we recommend you check the lever of the pressure and tempera...

Page 16: ...MANUAL 6 8 Connection diagrams Must be performed by an authorized service technician service shop for such operations Diagram 17 Connection of Evacuated tube collector VTC to solid fuel boiler WBS com...

Page 17: ...17 EN INSTALLATION and OPERATION MANUAL Diagram 18 Connection of Evacuated tube collector VTC to solid fuel boiler WBS solar water tank SON buffer tank P and three way valve...

Page 18: ...ance be carried out by an authorized service All service maintenance must be logged on the warranty card Checkup of operating pressure pump operation hydraulic connections Checkup of heat carrier flui...

Page 19: ...ce personnel Testing and operation pressures greater than the values established by Manufacturer and set forth in product manuals Freeze flood natural disasters or third party actions as well as any i...

Page 20: ...to the abovementioned obligations and up to the sum in accordance with the purchase receipt of the product to be claimed excluded is any liability for indirect damages such as loss of data at informa...

Page 21: ...L 10 Technical parameters Diagram 19 Elements of VTC type Evacuated tube collector 1 Manifold 2 Inlet Outlet sleeve 3 Evacuated glass tube 4 Holder and protector of evacuated glass tube 5 Frame of VTC...

Page 22: ...rber Selective Coating Manifold unit box material insulation E Anodized aluminum Polyurethane foam 30 mm Efficiency 0 in relation to aperture 66 Thermal loss coefficient 1 W m 2 K 1 500 Thermal loss c...

Page 23: ...on regulation 11 2 RECYCLING AND WASTE DISPOSAL At the end of life cycle of each product its components are due to be disposed of in conformity with regulatory prescriptions According to Directive 200...

Page 24: ...stem bg 12 Madara Blvd 9700 Shumen Bulgaria t 359 54 874 555 f 359 54 874 556 e mail ftrade sunsystem bg 13 Chelopeshko Shose Str 1839 So a Bulgaria t 359 2 903 97 80 f 359 54 874 556 e mail sales sun...

Reviews: