6
EN
TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL
Table 2. European Certification of Wood Pellets for Heating Purposes
Parameters
Units
ENplus-A1
ENplus-A2
EN-B
Diameter
mm
6 (± 1)
8 (± 1)
6 (± 1)
8 (± 1)
6 (± 1)
8 (± 1)
Length
mm
15 ≤ L ≤ 40
1)
15 ≤ L ≤ 40
1)
15 ≤ L ≤ 40
1)
Bulk density
kg / m
2
≥ 600
≥ 600
≥ 600
Calorific/heating value
MJ / kg
≥ 16,5-19
≥ 16,3-19
≥ 16,0-19
Humidity /moisture
Ма .-%
≤ 10
≤ 10
≤ 10
Dust
Ма .-%
≤ 1
3)
≤ 1
3)
≤ 1
3)
Mechanical durability
Ма .-%
≥ 97,5
4)
≥ 97,5
4)
≥ 96,5
4)
Ash
Ма .-%
2)
≤ 0,7
≤ 1,5
≤ 3,5
Melting point of ash
°C
≥ 1200
≥ 1100
-
Chlorine content
Ма .-%
2)
≤ 0,02
≤ 0,02
≤ 0,03
Sulfur content
Ма .-%
2)
≤ 0,03
≤ 0,03
≤ 0,04
Nitrogen content
Ма .-%
2)
≤ 0,3
≤ 0,3
≤ 1,0
Copper content
mg / kg
2)
≤ 10
≤ 10
≤ 10
Chromium content
mg / kg
2)
≤ 10
≤ 10
≤ 10
Arsenic content
mg / kg
2)
≤ 1,0
≤ 1,0
≤ 1,0
Cadmium content
mg / kg
2)
≤ 0,5
≤ 0,5
≤ 0,5
Mercury content
mg / kg
2)
≤ 0,1
≤ 0,1
≤ 0,1
Lead content
mg / kg
2)
≤ 10
≤ 10
≤ 10
Nickel content
mg / kg
2)
≤ 10
≤ 10
≤ 10
Zinc content
mg / kg
2)
≤ 100
≤ 100
≤ 100
1)
not more than 1% of the pellets may be longer than 40 mm, max. length 45 mm;
2)
dry weight;
3)
particles <3.15 mm, particulate matter, before handing over the goods;
4)
measurements with Lignotester limit value ≥ 97,7% by weight.
4. TRANSP
ORTATION OF THE BOILER
We recommend to transport the heating boiler to the
installation site in its packaging placed on the pallet. During
transport and installation, depending on the weight, suitable
safety devices should be used in accordance with Directive
2006/42/EC.
When transporting items weighing more than 30 kg, the use
of pallet jack, fork truck or other hoisting devices is a must.
Product must be in original packaging following the
instructions on the label - to be protected from adverse
weather conditions (snow, rain and dust) from the shocks,
and other activities likely to cause damage. In case of
malfunction of the fan or the motor drive (noise, friction)
or failure of high-tech elements such as broken LCD screen,
contact your nearest authorized service center for repairs
and maintenance.
The boiler is securely fastened with fasteners to a wooden
pallet.
Important: When installing the boiler, the wooden
pallet onto which the boiler is placed must be
removed by unscrewing the bolted connections
using flat ring wrench S13.
Table 3. Overal dimensions of Set CombiBurn DC-A,
including: Dual-chamber boiler, Burner, Auger, Fuel
hopper, ash-and soot container (packed and placed into
Fuel Hopper).
Set
CombiBurn
DC-A 30 kW
A,
mm
B,
mm
C,
mm
D,
mm
Weight,
kg
1320 1070
175
1770
527
Diagram 6. Indications dimensions
5. DELIVERY OF THE BOILER
• Inspect the integrity of the packaging upon delivery.
• Check whether all components have been delivered to
you. Boiler consignment package includes:
1) Set CombiBurn DC-A: boiler, burner, fuel hopper, ash-
and-soot container (packed and placed into fuel hopper).
2) Safety valve 3 bar.
3) Fire irons.
4) Cleaning brush for flue pipes.
5) Technical passport. Installation and operation manual .
6) Service booklet and Warranty card.
If any of the above items are missing, contact your supplier.
6. INSTALLATION OF THE HEATING BOILER
The assembly, installation and set-up of the boiler
must be performed by a technician authorized for
such operations.
Installer must indicate to the user of the installation
the minimum clearances from flammable materials
and liquids.
Requirements:
- Boiler room must be frost-proof;
- Boiler room must allow for continuous access of air
necessary to maintain combustion;
- Boilers must not be placed in inhabitable rooms;
- All boiler rooms must have correctly calculated vent
depending on the boiler output. The vent must be protected
by means of a net or grate.
The size of the vent is calculated according to the formula:
А = 6,02
*
Q
- where:
А
– area of the vent in cm,
Summary of Contents for BURNIT CombiBurn DC-A Series
Page 65: ...65 65 1 3 2 4 9 2 4 5 11 10 8 9 6 7...
Page 66: ...66 66 5 6 7 3 1 2 5 4...
Page 67: ...67 67 8...
Page 69: ...69 69 10 11...
Page 70: ...70 70 12...
Page 71: ......