4.9. Connecting the AC
Before connecting to the grid, please install a separate AC breaker between the inverter and the grid. Also,
it is recommended that installs an AC breaker between the backup load and inverter. This will ensure the
inverter can be securely disconnected during maintenance and fully protected from overcurrent. For the
3.6/5/6/7.6/8KW model, the recommended AC breaker for backup load is 32A/40A.
For the 3.6/5/6/7.6/8KW model, the recommended AC breaker for the grid is 40A.
There are three terminal blocks with "Grid", "Load", and "GEN" markings. Please do not disconnect the input
and output connectors.
GEN/AUX
Generator connection.
GRID
This works like a conventional grid-tied inverter. It is both an input and output connec-
tion for non-essential load and supply.
LOAD
Connection of essential loads such as lighting, security systems, and Internet
CAUTION
All wiring and cable sizes must comply with your particular country’s wiring regulations and Codes of
Practices. Ensure that suitable disconnection devices and RCDs are fitted.
Please follow the steps below to implement GRID, LOAD, and GEN port connections:
1.
Before making GRID, LOAD, and GEN port connections, make sure to turn off the AC breaker or discon
-
nector first.
2.
Remove a 10mm sleeve from each wire, unscrew the bolts, insert the wires according to the polarities
indicated on the terminal block and tighten the terminal screws. Ensure the connection is complete.
3. Then, insert AC output wires according to the polarities indicated on the terminal block and tighten the
terminal. Make sure to connect corresponding N wires and PE wires to related terminals as well.
4. Ensure the wires are securely connected.
5.
Check that the AC power source is isolated before attempting to connect it to the inverter. Insert AC out
-
put wires according to the polarities indicated on the terminal block and tighten the terminal screws. Be
sure to connect the corresponding N wires and PE wires to the correct terminals and ensure the wires
are securely connected.
Model
Wire Size
Cable (mm2)
Torque value (max.)
3.6kW
12AWG
4
1.2N.m
5kW
10AWG
6
1.2N.m
6kW
10AWG
6
1.2N.m
7.6kW
10AWG
6
1.2N.m
8kW
10AWG
6
1.2N.m
Summary of Contents for ECCO SUN-3.6K-SG05LP1-EU
Page 9: ...ECCO SG04LP1 User Manual 9 2 1 Product Size ...
Page 17: ...ECCO SG04LP1 User Manual 17 4 5 Function Port Definition ...
Page 21: ...ECCO SG04LP1 User Manual 21 ...
Page 23: ...ECCO SG04LP1 User Manual 23 4 9 1 Recommended AC Surge Protector ...
Page 26: ...ECCO SG04LP1 User Manual 26 4 12 Meter Connection 4 12 1 System Connection for the CHNT Meter ...
Page 27: ...ECCO SG04LP1 User Manual 27 4 13 Wiring System for Inverter ...
Page 30: ...ECCO SG04LP1 User Manual 30 4 16 Single Phase Parallel Connection Diagram 03 02 01 ...
Page 31: ...ECCO SG04LP1 User Manual 31 4 17 Three Phase Parallel Inverter 03 02 01 ...
Page 32: ...ECCO SG04LP1 User Manual 32 4 18 Typical Application Diagram of Diesel Generator ...
Page 63: ...ECCO SG04LP1 User Manual 63 6 OPERATING MODES 6 1 Mode I Basic 6 2 Mode II With Generator ...
Page 64: ...ECCO SG04LP1 User Manual 64 6 3 Mode III With Smart Load 6 4 Mode IV AC Couple ...
Page 65: ...ECCO SG04LP1 User Manual 65 ...
Page 71: ...Ltd wered by Po ...