33
Make sure the electrical system is connected correctly and has good grounding.
Make sure the hydraulic pipe is connected correctly.
Ensure adequate space for people and goods in the work area
。
2
、
The tank capacity is 10 L
,
fill N46 (SY1227-84) hydraulic oil into the tank of the
pumping station and the oil quantity should be between the top and bottom of the fuel
tank scale.
As low winter temperatures, hydraulic oil is more viscous, if necessary, you can choose
more than 32 # 40 # The following high-pressure anti-wear hydraulic oil. filling
lithium grease (GB7324-87) in the internal slider of slider touches , requires top-down
uniform filling
3
、
First click
up
button and check whether there is oil on the oil outset within
5seconds.If there's no oil proves the motor reverses, Any two-phase adjustment of the
power steering motor is ok. Press the up button and slider can be increased and repeated
lifting several times, the highest and lowest position, measuring if the height of the two
Summary of Contents for QJ-Y-2-35
Page 1: ...0 2 Post Lift Instruction Manual Model No QJ Y 2 35...
Page 7: ...6 Chapter II Safety instructions...
Page 9: ...8 2 2 The warning signs...
Page 10: ...9...
Page 18: ...17...
Page 19: ...18 1 Hex nuts M20 8 2 Wire rope 2 Pump station connection diagram...
Page 25: ...24...
Page 26: ...25...
Page 27: ...26 Above is the drawing of parts of point a and b...
Page 29: ...28 Above is the drawing of parts at point c...
Page 30: ...29 Above is the drawing of parts at point e and f...
Page 40: ...39 7 3 Hydraulic principle diagram Interface schematic 7 4Pump station decomposition diagram...
Page 46: ...45 Company saved...
Page 47: ...46...
Page 48: ...47...
Page 49: ...48...
Page 50: ...49...
Page 51: ...50...
Page 56: ...55 99 15040000006steel rope 8 8665 2 10091011140920Channel section steel 1...