32
10
、
Connect power supply and terminal according to circuit diagram. And make sure
the phase of the connection is correct and the grounding is reliable.
The wiring of the circuit must be connected by a professional electrician
Ensure that the power supply voltage is same with the lift requirements
Make sure the phase connection is correct and that the wrong connection will burn out the motor
and not be covered by the warranty
Pump stations must be kept dry
11
、
Installation of the arm. Insert the arm into the transverse slot of the carriage
,
aim
the holes in the carriage’s horizontal tube and the holes of the arm shaft and insert the
arm shaft and then put the circlips on the end of the arm shaft. Then install tray,
auxiliary tray, etc.
4.6 Test and adjustment
1
、
Please confirm before starting:
Make sure the column is vertical and the arm is horizontal.
Make sure the expansion bolt is fastened.
To ensure that the power supply voltage and motor nameplate requirements are
consistent.
Summary of Contents for QJ-Y-2-35
Page 1: ...0 2 Post Lift Instruction Manual Model No QJ Y 2 35...
Page 7: ...6 Chapter II Safety instructions...
Page 9: ...8 2 2 The warning signs...
Page 10: ...9...
Page 18: ...17...
Page 19: ...18 1 Hex nuts M20 8 2 Wire rope 2 Pump station connection diagram...
Page 25: ...24...
Page 26: ...25...
Page 27: ...26 Above is the drawing of parts of point a and b...
Page 29: ...28 Above is the drawing of parts at point c...
Page 30: ...29 Above is the drawing of parts at point e and f...
Page 40: ...39 7 3 Hydraulic principle diagram Interface schematic 7 4Pump station decomposition diagram...
Page 46: ...45 Company saved...
Page 47: ...46...
Page 48: ...47...
Page 49: ...48...
Page 50: ...49...
Page 51: ...50...
Page 56: ...55 99 15040000006steel rope 8 8665 2 10091011140920Channel section steel 1...