13
4.1 Installing tools
:
1
、
Φ18 churn drill bit
2
、
churn drill
3
、
12-14
、
17-19 spanner
4
、
adjustable spanner
5
、
cross screw driver
,
flat screw driver
6
、
hammer
7
、
band tape
(
5m
)
8
、
squareness gauge
9
、
chalk
4.2 Installation warning
4.3 Choose installation place.
1
、
Lift is designed to be installed inside the house, space is no obstacle, well-ventilated.
Shall not be installed near the wash area, paint, paint corrosive solvents stacking area.
if the installation place close to bedroom, may explode, very dangerous. We must avoid
here to install. There are other state regulations on health and safety. Such as minimum
distance from walls or other equipment. Emergency access and other requirements.
2
、
Must keep fire far away from lift installation place, the surrounding environment
must be good.
4.4 Installation requirement on ground
Only manufacturers or distributors authorized professional technical personnel may install
the equipment. The installer must have the qualifications. Non-professional installation
may cause serious injury to person or equipment.
Installation according to the chart.
Summary of Contents for QJ-Y-2-35
Page 1: ...0 2 Post Lift Instruction Manual Model No QJ Y 2 35...
Page 7: ...6 Chapter II Safety instructions...
Page 9: ...8 2 2 The warning signs...
Page 10: ...9...
Page 18: ...17...
Page 19: ...18 1 Hex nuts M20 8 2 Wire rope 2 Pump station connection diagram...
Page 25: ...24...
Page 26: ...25...
Page 27: ...26 Above is the drawing of parts of point a and b...
Page 29: ...28 Above is the drawing of parts at point c...
Page 30: ...29 Above is the drawing of parts at point e and f...
Page 40: ...39 7 3 Hydraulic principle diagram Interface schematic 7 4Pump station decomposition diagram...
Page 46: ...45 Company saved...
Page 47: ...46...
Page 48: ...47...
Page 49: ...48...
Page 50: ...49...
Page 51: ...50...
Page 56: ...55 99 15040000006steel rope 8 8665 2 10091011140920Channel section steel 1...