40
Two post hydraulic auto lift
Quality certification
The product meets requirements of
Q/0601KHD002-2013 standard
,
is qualified to be out
of factory after check
Serial no
:
Legal representative
:
Inspection charger
:
D a t e :
Ya n t a i H a i d e S c i e n c e a n d Te c h n o l o g y C o . , L t d .
A d d r e s s : 2 1 . To n g r u n R o a d , A P E C I n d u s t r i a l Z o n e , Z h i f u
D i s t r i c t , Ya n t a i , C h i n a
Te l : 8 6 - 5 3 5 - 6 8 5 3 8 1 2 , 6 8 5 3 8 1 6 ;
S e r v i c e h o t l i n e : 8 6 - 5 3 5 - 6 8 5 3 1 2 9
Summary of Contents for QJ-Y-2-35
Page 1: ...0 2 Post Lift Instruction Manual Model No QJ Y 2 35...
Page 7: ...6 Chapter II Safety instructions...
Page 9: ...8 2 2 The warning signs...
Page 10: ...9...
Page 18: ...17...
Page 19: ...18 1 Hex nuts M20 8 2 Wire rope 2 Pump station connection diagram...
Page 25: ...24...
Page 26: ...25...
Page 27: ...26 Above is the drawing of parts of point a and b...
Page 29: ...28 Above is the drawing of parts at point c...
Page 30: ...29 Above is the drawing of parts at point e and f...
Page 40: ...39 7 3 Hydraulic principle diagram Interface schematic 7 4Pump station decomposition diagram...
Page 46: ...45 Company saved...
Page 47: ...46...
Page 48: ...47...
Page 49: ...48...
Page 50: ...49...
Page 51: ...50...
Page 56: ...55 99 15040000006steel rope 8 8665 2 10091011140920Channel section steel 1...