19
No
Name
Spec
Qty
1
Pump
1
2
Flange nut
M8
4
3
Flange hexagonal bolt
M8×30
4
Top cover installation drawing
:
No
Name
Spec
Qty
1
Top cover
2
2
Top pulley-bottom plate
2
3
Bimetallic bearing
302519
2
4
Pulley side cushion
2
5
Shaft elastic ring
φ25
2
6
hex nut
M12
8
7
Elastic washer
φ12
8
8
Flat washer
φ12
8
9
Hexagon headed bolt
M12×30
8
Height adaptor installation diagram
:
Summary of Contents for QJ-Y-2-35
Page 1: ...0 2 Post Lift Instruction Manual Model No QJ Y 2 35...
Page 7: ...6 Chapter II Safety instructions...
Page 9: ...8 2 2 The warning signs...
Page 10: ...9...
Page 18: ...17...
Page 19: ...18 1 Hex nuts M20 8 2 Wire rope 2 Pump station connection diagram...
Page 25: ...24...
Page 26: ...25...
Page 27: ...26 Above is the drawing of parts of point a and b...
Page 29: ...28 Above is the drawing of parts at point c...
Page 30: ...29 Above is the drawing of parts at point e and f...
Page 40: ...39 7 3 Hydraulic principle diagram Interface schematic 7 4Pump station decomposition diagram...
Page 46: ...45 Company saved...
Page 47: ...46...
Page 48: ...47...
Page 49: ...48...
Page 50: ...49...
Page 51: ...50...
Page 56: ...55 99 15040000006steel rope 8 8665 2 10091011140920Channel section steel 1...