PULSE 6 SERVICE MANUAL
PAGE 4.3
2009
SUNRISE MEDICAL
Section 4
12.
If the above tests pass, replace the wiring
harness leading from the batteries through the
circuit breaker and control module. Retest as
necessary.
.
10. If battery voltage is not present, use a
Multimeter and measure for continuity across the
fusible links connected to positive (+) terminal of
each battery (
fi
g. 4.7). Normal resistance is less
than 1 ohm. If open, replace the defective battery
harness. Retest as necessary.
.
Caution: To prevent damage to the Multimeter,
ensure that the batteries are disconnected.
11. Check for continuity across the circuit
breaker (
fi
g. 4.8). Normal resistance is less
than 1 ohm. If open, replace the circuit breaker.
Retest as necessary. Note: Access to the circuit
breaker terminals is easier if the front battery is
removed.
.
Rnet Troubleshooting Procedures
9.
Verify that battery voltage is present at
each connector leading to the batteries (
fi
g. 4.6).
fig. 4.6
fig. 4.7
fig. 4.8